After a long absence, the Billing Boats Dana build is back again! Ship modeler Clare Hess has been working on this simple build off-and-on for a while, and is back to it, showing readers a simplified rigging of the first of the sails.
The end of the year is drawing very near and it’s time to finish up the Dana build. All of the deck work is done at this point, and it’s time to mount the sails. I’m beginning by finishing the booms and gaffs. The booms are the spars that secures the foot of the sail. The gaff is the spar that secures the top or head of the sail.
The booms have to have a single block attached to each, so that the line that controls the angle of the sail to the wind, the sheet, can run through it and through a sheet block attached at the deck. Meanwhile, the gaffs need a length of line with both ends attached to it. One end is attached near the end of the gaff, and the other end is attached about 1/3 of the way down the length of the gaff. Both…
View original post 420 more words